News & Events

News & Events

PV Drilling held first internal HSEQ Conference in 2023

On the afternoon of 19/7 in Vung Tau city, Petrovietnam Drilling and Well Service Corporation (PV Drilling) successfully held the first internal HSEQ Conference in 2023.

Participating and chairing the Conference, there was Mr. Dinh Quang Nhut – PV Drilling’s Vice President, in charge of the Safety – Health – Environment – Quality (HSEQ) activity of the Corporation, cum Director of PVD Drilling Division (PVD DD). Besides, there was also the participation of the management from PV Drilling’s subsidiaries, HSEQ managers, HSEQ executives, rapporteurs, heads of production base, etc.

The first internal HSEQ Conference in 2023.

At the conference, PV Drilling’s HSEQ representative delivered a summary report on HSEQ work and highlighted important milestones within the first half of 2023. Accordingly, PV Drilling’s operated the rig fleet safely, effectively and achieved Zero LTI; especially in quarter 1/2023, the jack-up PV DRILLING III rig set the new record of drilling the longest oil and gas well with the length of 6,963m in Malaysia. Another remarkable achievement in HSEQ activities can be mentioned here was that PV Drilling was honored to receive an award of “Best Incident Rate Offshore Company” and the jack-up PV DRILLING I rig won an award of “Years Recordable Free Offshore Rig”, both were given by IADC – SEAC in May, 2023.

Mr. Nguyen Huy Trong, manager of PV Drilling's HSEQ division (standing) reported at the Conference.

The report also emphasized important contributions from our clients for the improvement of HSEQ system at PV Drilling. Specifically in March 2023, Brunei Shell Petroleum’s representatives (BSP) – our client who is using the TAD – PV DRILLING V for the deepwater drilling campaign in Brunei, dropped a visit to our offices, workshops, productions bases in Ho Chi Minh City and Vung Tau; besides, other clients such as OPS (Thailand), Petronas (Malaysia), JVPC, VR – ABS, etc. performed the evaluation/inspection on the jack-up PV DRILLING I rig; Petronas, SK Earthon and PVEP evaluated the operation on the jack-up PV DRILLING VI, etc. Through inspection, our clients/registration agencies highly recognized our HSEQ operation activities.

At the discussion, representatives from PVD Offshore and PVD Training shared their experiences on “Secure the quality of rig manpower provision service”; PVD DD discussed about “Monitor rig manpower quality”. All the discussions were focused on the training of rig manpower to ensure service quality, ensure safety in rig management and operation. In addition, the presentation about “Greenhouse gas (GHG) emission in accordance with ISO 14064 – 1:2018” presented by PV Drilling’s HSEQ division attracted special attention while providing the latest information and related procedures about GHG over the world as well as Petrovietnam's GHG regulations and implementation guidelines.

Directing at the conference, PV Drilling’s Vice President Dinh Quang Nhut highly appreciated the report on GHG of the HSEQ division. Pursuant to Decision No. 01/2022/QD – TTg dated 18 January, 2022 of the Government, PV Drilling is not subject to a GHG inventory. However, environmental protection is among our priorities in business operation in order to minimize to the lowest the risks to the surrounding environment. In 2022, the Corporation started to replace fluorescent light bulbs with LED lights on the rig fleet. This project is expected to be completed within 3 or 4 more years.

PV Drilling's Vice President Dinh Quang Nhut (standing) directed at the Conference.

“In the upcoming time, the HSEQ division will promote the plan for GHG control, which is suitable with PV Drilling and its subsidiaries. In the HSEQ summary conference last March, we mentioned about GHG but in this conference, we are discussing in detail extensively, and ready to respond promptly when related parties such as our clients request to reduce GHG emissions on the rig, workshops, production base, etc.” – Mr. Dinh Quang Nhut emphasized.

Making a directing speech at the conference, Mr. Dinh Quang Nhut made strong commitments towards the HSEQ executives and continued to affirm: “Manpower is the most valuable assets”; therefore, safety must be on the top priority, especially the awareness, knowledge about safety together with practical experiences on dealing with safety risk which may occur while working. In fact, in business operation, HSEQ must be improved continuously without stopping, never being satisfied with results and awards achieved.

On behalf of the HSEQ executives at PV Drilling, Mr. Nguyen Huy Trong – Manager of HSEQ division, sent special thanks to PV Drilling’s management for the kind support and close direction to HSEQ activities. He also committed that the HSEQ executives would continue to try the best effort, keep learning and training, be united and cooperating effectively as well as information sharing, etc. to improve the system, ensuring its important contribution to the overall success of PV Drilling.

PV Drilling’s PR Team

backtotop