PVD Deepwater

Introduction

By providing and operating the Semi-submersible Tender assist drilling rig (TAD), PVD Deepwater, which was established in July 2010, carries on an important mission that is to supply the drilling services in Vietnam deep water offshore and surrounding areas, resulting in implementing the strategy of “Deeper & Higher” of PV Drilling


Company name: PVD DEEPWATER
Date of establishment: 14/7/2010
Head Office:  3rd Floor, Sailing Tower, 111A Pasteur Street, Ben Nghe Ward, District 1, Ho Chi Minh City, Vietnam
Tel: (+84 - 28) 35 218 866
Fax: (+84 - 28) 38 228 520
Director: Mr. Nguyen Van Thuong

At PVD Deepwater, human is always considered as one of the most important resources. We have created effective working environment that provide our employees opportunities and necessary conditions to promote their individual skills and capabilities. It is the workplace where the passion of employees is nurtured and helped them succeed in realizing their career goals by the supporting of management board.

PVD Deepwater has been operating the TAD which is recognized as a high technology practice by the Ministry of Science and Technology. Based on the advantages of technology, the requirements in terms of  Heath – Safety – Environment – Quality (HSEQ), the risk management of Head Quarter, the international standards as well as the information technology solutions, such as Maximo, ERP, Simplesoft, the company has been improving  the productivity of the TAD in supporting the search, exploration and oil reserves in Vietnam deep water areas, resulting in bringing a high productive efficiency.
Article 1
Article 2

By setting up the minimum level of inventory, the company not only pledges to operate the rig safely and effectively, but also can minimize the inventory cost. In addition, the efficient management of supply chains and investing projects has been both greatly impacting upon the TAD operation and ensure to optimize the company operating expenses. Meanwhile, PVD Deepwater guarantees to be a trusty supplier that is always ready for emergency.

To reach the clients’ requirements of quality and effect, “improvement and continuous improvement” is the company motto. Thanks to pay high attention to build up the HSEQ management system, the company can easily measure the effectiveness of jobs, the customer satisfaction, and identify as well as allocate the potential risks that might impact upon productivity. Hence, the preventive solutions and corrective actions are carried on promptly.

Having been well combined between the mentioned factors for years, the company has been successfully operating the TAD with operation efficiency at more than 96%, which is much higher than that of the drilling contractors in the world. Based on the technical and economical standards, the Management Board of company has been gradually bringing PVD Deepwater into the route of “full development”. That is the way PVD Deepwater pledges to create the added value for its customers and investors, which makes the company become a prestigious and reliable drilling contractor in the area and the world.

After completing 16 HPHT wells of the drilling campaign for BienDong POC in  Hai Thach and Moc Tinh fields, on September 24, 2019, PV Drilling successfully signed a contract for provision of the semi-submersible tender assist drilling rig - PV DRILLING V with Brunei Shell Petroleum Company Sdn Bhd (BSP).The signed contract has a term of six years, plus two times of two years extension with commencement date of April 1, 2021 to serve for BSP's drilling program in Brunei.

Service

backtotop